INSPECTIONAL SERVICES DEPARTMENT
|
Plumbing and Gas
Helpful Information:
- All Inspectors are in the office from 8-9 a.m. and 3-4 p.m. for questions.
- Check status of contractor
- All Fees will be doubled in the event work is started before a permit is obtained or permission is granted by the Inspector.
Local Regulations:
- If applications are sent through the mail allow a minimum of three days for the permit to be issued before starting work. Please call to verify application has been received and processed. Enclose a self addressed stamped envelope for the return of permits. If any questions are not answered or information is missing the application will be returned.
- Requests for inspection shall be made no later than 9 a.m. for the inspection appointment on that day if scheduling is available.
- This office shall be notified immediately when jobs are finished.
All fees will be doubled in the event that work is started before a permit is obtained or verbal permission is granted by the Plumbing/Gas Inspector.
Plumbing Fees:
Type
|
Fee |
Replacement hot water tank | $20 |
Residential (Per dwelling unit, plus $10.00 per fixture) | $50 |
Commercial (Per unit, plus $20.00 per fixture) | $100 |
Remodel of water or waste piping only | $50 |
Cap sewer for demolition | $100 |
Piping and treatment of special waste (plus $20.00 each fixture) Stamped drawings required | $150 |
Reinspection fee (for each notice) | $30 |
Device (+$10. per fixture or device) | $50 |
Gas Fees:
Type
|
Fee |
Replacement hot water heater | $20 |
Residential (Per dwelling unit, plus $10 per appliance) | $50 |
Commercial (Per unit, plus $20 per appliance) | $100 |
All elevated gas pressure permits, or appliance 200,000 btu and over (in addition to unit and application charge) | $50 |
Reinspection fee (for each notice) | $30 |